Sterling Ridge Infrastructure – Civil has been a significant player in the heavy civil construction field for in excess of 30 years. The respective founding corporations boast in excess of eighty years of collective experience in heavy civil construction. Sterling Ridge Infrastructure – Civil has the experience, expertise and extensive resources necessary to manage and execute heavy civil construction projects of any magnitude. Our focus has been the construction of roads, bridges, sewers and watermains. Sterling Ridge Infrastructure – Civil is proud to have been a contributing sub-contractor to many large projects including, the Gordie Howe International Bridge – Canadian Point of Entry Surcharge and Concrete Works, the WDBA Hydro One Transmission relocation, the Herb Grey Parkway and the New Brighton Beach Generating Station in Windsor, Ontario.
Division Services
Heavy Civil
At Sterling-Ridge, we achieve continuous success in the impressive execution of a variety of complex, challenging, and non-conventional heavy civil construction projects. Our services feature collaboration among our group sectors for consistent client convenience and satisfaction.
Earthworks
Earth and Rock excavation
Deep Foundations, Pile driving and sheet Piling
Soil stabilization and improvement
Directional Drilling
Demolition
Waste management facilities
Environmental Conservation Infrastructures
Sewers and
Watermains
With dedicated and experienced teams, Sterling-Ridge has installed hundreds of kilometers of linear infrastructure of sewer and watermain systems. Our clients consist of Municipalities, Commercial and Industrial Groups as well as Private Companies and Developers.
Water-mains and Sewer construction
Open excavation and trenchless pipe installation
Concrete structures installation
Underground Infrastructure rehabilitation
Municipal and Commercial services
Utility contracting
Road, Culverts
and Bridge
Construction
Clients who have complex projects rely on Sterling-Ridge's ability to provide and develop unique solutions. Sterling-Ridge approaches each project with a focus on delivering where others cannot.
Cast in Place and Precast concrete structures
Temporary Roads and Bridges
Road construction and rehabilitation
Bridge construction and rehabilitation
Earthworks
Leisure Lake RV Resort
R E C E N T P R O J E C T S
SCULLY/ST. MARKS PUMP STATION
Client Name: Town of Tecumseh
Duration: Sept 2023 - July 2025
Project Value: $19.2 Million
-
The project will be a collaborative effort between Sterling Ridge Infrastructure and Sterling Ridge General Contracting. The primary scope of work is as follows:
Construction of a new stormwater pump station and Outlet
Construction of shoreline protection walls
Reconstruction of Storm and Sanitary Sewer, Watermain, Street Light, and Road along Riverside Drive between Grant Avenue and Arlington Boulevard
Decommissioning of two existing stormwater pump stations
DOMINION BLVD REHABILITATION
Client Name: City of Windsor
Duration: August 2023 to December 2023
Project Value: $5.5 Million
-
Dominion Boulevard from Northwood Street to Ojibway Street. Storm Sewer, Pavement, Watermain and Street Lighting Rehabilitation.
LEGACY BEACON
Client Name: Oscar Construction
Duration: May 2023 - May 2024
Project Value: $2.66 Million
-
Excavation and backfill for new legacy beacon building, new storm, sanitary and water service work.
ENGINEERING FILL AND SURCHARGE PROJECT
Client Name: Bridge North America
Duration: 2019-2022
Project Value: + $30 Million
-
Sterling Ridge Infrastructure Inc. has been awarded the Engineering Fill and Surcharge Package for the Gordie Howe International Bridge from Bridging North America “BNA”. The main scope is to supply and install more than 750,000 metric tonnes of aggregate material and within the site to install and move more than 850,000 metric tonnes of aggregate material.
In addition to the aggregate material, instrumentation devices for monitoring the settlement and ground water pressure have been installed and are part of the scope of work. The main activities are occurring at the Canadian Point of Entry “CPOE” for the Gordie Howe International Bridge in Windsor, Ontario.
In one day, Sterling Ridge Infrastructure Inc. supplied and installed 15,367.40 metric tonnes of aggregate material with more than 70 trailers involved to truck the material from Erie Sand and Gravel in Leamington to the job site at Windsor. Sterling Ridge Infrastructure Inc. also performed 85 compactions tests on the sublots.
The project team has worked more than 12 hours a day, six days a week with full production and efficiency to put us ahead of critical schedule.
EASTLAWN AVE. RECONSTRUCTION WYANDOTTE ST. E - EDGAR AVE.
Client Name: City of Windsor
Duration: Sept 2021-July 2022
Project Value: $4 Million
-
•Complete reconstruction of 2 residential blocks
• Replacement of storm, sanitary sewer mains and services
• Replacement of watermain and water services
• Road reconstruction including curbs, sidewalks and driveways
• Replacement of the street lighting
BNA - CONCRETE WORKS
Client Name: Bridge North America
Duration: 2020-2022
Project Value: $24 Million
-
The Concrete Works Project at the Canadian Point of Entry for the Gordie Howe International Bridge includes construction of the footings, piers, walls, slabs, retaining and shear walls for the eleven buildings.
This package includes excavation, backfilling, insulation, waterproofing and dock levelers as well.